Project details
1
With the objective of transporting additional capacity of the El Encino-La Laguna system, it includes 36”x36” hot tapping, a 16” diameter line and a Gas Measurement, Regulation and Control Station.
Date
2018
Location
Chihuahua and Durango
Industry
Energy
Activities
1
- Detailed Engineering Activities.
- Preparation and Management of Permits or Modifications.
- Estimated costs.
- Investment Program and Technical Supervision.