New Hades

Project details
1

Expansion Plan for the New Hades project, as part of the growth of the assets and the continuous growth of the company, Fermaca, which consists of two Loops of 137 and 105 km.

Date

December 2020 – March 2021

Location

Jalisco, Mexico

Industry

Energy

Development phases
1

Compression station

  • Technical feasibility studies of properties.
  • Archaeological pre-feasibility study.
  • Procedures and technical-legal activities necessary to
    acquisition of the property for the installation of a compression station.
  • Permits.
  • Statement of environmental impact and risk.
  • Archaeological prospecting (phase 1, phase2).
  • Extended basic engineering (for equipment quotes and permit management start).
  • Costs and budgets.

48” diameter loop (STGN EELL)

  • Topographic study.
  • Statement of environmental impact and risk.
  • Archaeological pre-feasibility study.
  • Feasibility of Right of Way.
  • Legalization.
  • Basic engineering of the transport system.
  • Costs.
  • Federal building permits.

Compression stations

  • Procedures and technical-legal activities necessary for the acquisition of the property for the installation of the compression station.
  • Permits.
  • Statement of environmental impact and risk.
  • Archaeological prospecting (includes signing of agreement and resources).
  • CRE permits.
  • Extended basic engineering (for equipment quotes and permit management start.

48” diameter loop (STGN EELL)

  • Environmental feasibility study and environmental risk.
  • Archaeological pre-feasibility study.
  • Feasibility of Right of Way.
  • Legalization.
  • Basic Engineering of the Transportation System.
  • Costs.
  • Federal building permits.